💙 Gate Square #Gate Blue Challenge# 💙
Show your limitless creativity with Gate Blue!
📅 Event Period
August 11 – 20, 2025
🎯 How to Participate
1. Post your original creation (image / video / hand-drawn art / digital work, etc.) on Gate Square, incorporating Gate’s brand blue or the Gate logo.
2. Include the hashtag #Gate Blue Challenge# in your post title or content.
3. Add a short blessing or message for Gate in your content (e.g., “Wishing Gate Exchange continued success — may the blue shine forever!”).
4. Submissions must be original and comply with community guidelines. Plagiarism or re
The first assembly of the AG600 batch production has been delivered for test flight.
Jin10 data May 12 news, recently, the first aircraft of AG600 batch production (aircraft 1101) has completed total assembly and offline. Currently, the second aircraft of AG600 batch production (aircraft 1102) has completed the installation of major systems such as engine and landing gear, as well as insulation of the entire aircraft wiring harness, and is conducting avionics system testing work. The third aircraft of batch production (aircraft 1103) has also completed the connection of major components such as wings and vertical tail, entering the system installation phase.